Denver South Park and Pacific Historical Society
 

🚂 Track Work Results for Summer/Fall 2025 🚂

The 2025 work sessions were very productive thanks to our many volunteers.

Team Como 2025

The 2025 Como Work Team
All Photos On This Page by Bob Schoppe Unless Otherwise Noted

The depot was painted 10 years ago and sections have faded. Here we are repainting the door. 

Dan Silbaugh and David Winner are all smiles as the Bridgeport vertical mill is powered up for the first time. 

Bob Revis is unloading a truckload of rail from Dolores. 

Chris Tome uses his skid steer to spread out ballast on the track to the boxcar sheds. 

Doug Summer gives the speeder a much needed tuneup. 

Alex Hois oversees loading bridge timbers to be used in stall number 6. 

The crew is preparing stall 6 for the bridge timbers to support the rail. 

Tom Lawson is enjoying his 10 Ton Plymouth locomotive parked at the Como depot for the first time. 

A future Como volunteer stays dry in a light rain. 

After many years, the C&S safe from the Boulder depot was reopened. 

Work has commenced on repairing the roof on the Como Hotel. 

A hot August night at the Como depot. 

The process of winterizing the trackside markers involves wrapping them tightly in trash bags and duct tape to prevent them from being sandblasted by the winter winds. 

Is it 1931 or 2025?